METALS & MINING

Grind Less Power Into Every Tonne

EM3 engineers furnace, comminution and electrification programmes for operations where energy is commonly the second biggest cost on site.

SECTOR REALITY

Where The Energy Actually Goes

Independent industry figures show where cost and carbon concentrate in mining and metals processing.

25%of mine site energy consumed by comminution
up to 50%of underground mine energy used by ventilation
75%of steel sector energy met by coal
40+major steel buyers committed to net zero

Sources: Weir Group/CEEC, IEA, BBA, Climate Group SteelZero

THE CHALLENGES

The Pressures We Hear On Site

Six problems plant managers, energy managers and sustainability directors raise with us across metals and mining.

  1. Grinding circuits consume most of the power

    On a concentrator, the mill drives dwarf every other electrical load, and kWh per tonne milled drifts upward every time ore hardness changes. Comminution commonly accounts for around 25% of an average mine site's final energy, and more on copper and gold concentrators. Most sites cannot see which part of the circuit is responsible.

  2. Furnaces and ladles lose heat at every step

    Off-gas leaves at several hundred degrees Celsius, doors stand open, ladles wait without lids, and refractory degrades quietly between campaigns. Each loss looks small on its own. Together they typically put double-digit percentages of fuel through the roof of the building.

  3. Ventilation runs flat out regardless of activity

    Main fans were commissioned at full duty and have stayed there ever since, whether a level is active or empty. Underground, ventilation can account for up to half of site energy. Fan power scales roughly with the cube of airflow, so over-ventilating is one of the most expensive habits in mining.

  4. Diesel fleets waiting on electrification decisions

    On open pit operations, haul truck fuel often exceeds site electricity in energy terms, yet the electrification business case keeps stalling on infrastructure, duty cycles and capital timing. Meanwhile the fleet keeps burning, and every deferral year is priced in fuel and carbon.

  5. Remote sites pay premium energy prices

    Long grid connections, constrained networks and on-site diesel generation mean every wasted kilowatt hour costs more than it would anywhere else. Efficiency is the cheapest megawatt a remote operation will ever buy, but it rarely gets engineered with the same rigour as production.

  6. Customers now demand Scope 3 evidence

    Steel and metals buyers are organising: more than 40 major businesses have committed through initiatives such as SteelZero to procure net zero steel. Offtakers ask for decarbonisation plans and verified data, not intentions, and those requests land on the energy manager's desk.

TECHNICAL DEPTH

What We Engineer In Your Plant

We work at the level of the equipment, not the slide deck. These are the energy sub-systems EM3 engineers on metals and mining sites.

  • Furnaces, smelters and ladles

    We audit and optimise reheat furnaces, electric arc furnaces and ladle practice: regenerative or recuperative burners, furnace pressure control, door discipline, hot charging and refractory upgrades.

  • Waste heat recovery

    We map furnace and smelter off-gas streams running at several hundred degrees Celsius and engineer recovery to waste heat boilers, recuperators or process preheat.

  • Grinding and comminution circuits

    We survey the crushing, SAG and ball milling circuit against a kWh per tonne milled baseline, optimise control, classification and scheduling first, then assess capital options such as HPGR, fine screens and pre-concentration.

  • Ventilation on demand

    We engineer VOD schemes with variable speed drives, airflow sensing and zone control that match underground airflow to where people and diesel equipment actually are.

  • Dewatering and pumping

    We right-size pumps and impellers, apply variable speed drives, and shift pumping into off-peak tariff periods where storage allows.

  • Compressed air systems

    We run leak surveys, reduce pressure set-points and zone the network, the classic cross-cutting measures across mills, mines and smelters.

  • Electrification of heat and mobile loads

    We build feasibility cases for electrifying furnace heat and haul fleets, from trolley assist to staged replacement, grounded in real duty cycle data rather than vendor brochures.

  • On-site generation and storage

    We integrate on-site generation and storage with the site load profile so remote operations reduce both cost exposure and carbon at the same time.

EM3 engineering work at a minerals processing grinding circuit
How we engage

How The Work Gets Done

Every engagement follows the same engineering discipline, whatever the sector.

  1. Audit

    Instrumented, engineering-led, and baselined against your production data.

  2. Roadmap

    A costed, sequenced register of measures your board can fund in steps.

  3. Delivery

    Designed and delivered around production, never in spite of it.

  4. Verify

    Savings measured against the baseline and verified to IPMVP.

Start With An Audit
COMPLIANCE DRIVERS

Regulation As A Roadmap

Regulation in this sector reads as cost until it is engineered into a plan. We use each driver to fund and sequence the measures the site needed anyway.

  • ISO 50001

    The standard asks for a working energy management system with baselines, EnPIs and continual improvement. EM3 structures its energy management services according to ISO 50001 and builds the metering, reviews and documentation that keep a processing site audit ready.

  • EU ETS

    EU smelters and processors carry a carbon price on every tonne of fuel burned, which compounds every furnace inefficiency. We turn ETS exposure into a prioritised abatement register with verified savings behind each line.

  • CSRD

    Corporate sustainability reporting now requires audited energy and emissions data from operations, not estimates. We build the site-level data foundation, sub-metered and traceable, that group reporting teams can stand over.

  • Offtaker Scope 3 requirements

    Initiatives such as SteelZero and the First Movers Coalition mean buyers ask suppliers for decarbonisation roadmaps and measured progress. We give your commercial team an engineering-backed answer instead of a holding statement.

  • National audit schemes

    ESOS in the UK, SI 426 in Ireland and equivalent schemes in other geographies mandate periodic energy audits. We run the audit once, properly, so the same work that satisfies the regulator also feeds the investment plan.

SECTOR EXPERTS

Engineers Who Know The Circuit

Your first conversation is with our commercial team. Delivery is by engineers who have spent their careers in concentrators, smelters and underground operations.

  • Daniele Dominguez

    Commercial Director

  • Senior Energy Engineer, Comminution and Concentrator Systems

    Owns grinding circuit surveys, kWh per tonne milled baselines and control optimisation programmes.

  • Lead Engineer, Furnaces and Waste Heat Recovery

    Owns furnace thermal audits, burner retrofit specification and off-gas heat recovery design.

  • Energy Management Consultant, Mining and Metals

    Owns sub-metering design, regression-based EnPIs and IPMVP measurement and verification.

RESOURCES

Go Deeper On Mining Energy

Practical engineering reading from our metals and mining work.

Common questions from metals & mining teams

Where does the energy go in a processing plant?

On mine sites, comminution commonly accounts for around 25% of final energy, and more on copper and gold concentrators. Underground, ventilation can reach up to 50% of site energy. In metals processing, furnace and smelting heat dominates. Dewatering, pumping and compressed air take most of the rest. The honest answer for your plant comes from sub-metering by circuit, which is where every EM3 audit starts.

Can ventilation be reduced safely?

Yes, when it is engineered rather than improvised. Ventilation on demand keeps statutory minimum airflows and re-entry rules intact while matching delivery to where people and diesel equipment actually are, using airflow sensing, variable speed drives and zone control. Demonstration projects have shown 20 to 50% fan energy savings. The system is built inside the mine's ventilation plan, with hard interlocks, so safety margins are preserved, never traded.

What does electrification mean for a remote site?

It means a staged plan, not a leap. We start with duty cycle and load data, then assess which loads electrify first: heat through waste heat recovery and electric technologies, mobile fleet through trolley assist or phased replacement. Network capacity, on-site generation and storage are evaluated together, because the grid connection is usually the binding constraint at a remote site. The output is a costed sequence your board can fund in steps.