Skip to content
Request An Audit
Energy Management & Intelligence

Metering Solutions That Make Your Site Properly Measurable

The engineering design of the physical metering your site needs: what to install, where, and how it connects, all driven by the KPIs you actually need, so every meter earns its place and the data is genuinely usable.

  • Designs the metering infrastructure from your KPIs, not from a template
  • Specifies the meters, locations and how they integrate with SCADA or BMS
  • A phased plan with high-level capital costs, ready for implementation
  • The engineering definition of what to install, before anyone installs it
  • Part of SHV Energy
  • ISO 50001
Engineer in PPE inspecting an electrical metering switchboard against a technical wiring diagram on the plant floor
What we do

What This Service Is

The Metering Solutions service is the engineering design and specification of the physical metering infrastructure required to measure, capture and manage energy performance across a site. It typically follows EnPI Mapping and Meter Gap Analysis: where mapping defines what should be measured and why, Metering Solutions defines how that is physically implemented in the plant.

The focus is on designing and planning the installation of the meters, sensors and supporting systems needed to collect accurate and usable energy data, including the meter locations, the equipment specification, and how the data will be collected and integrated into your energy management processes. It covers both the hardware and the associated data-collection and automation systems. This is not the installation itself. It is the engineering definition of what needs to be installed, where, and how, to bring the site to a level where energy performance can be properly measured and managed.

Governing standardISO 50001 · Metering BoD

The challenge

The Challenge It Solves

Before this service, the client typically does not have a metering system capable of supporting proper energy management. The site may have some meters installed, but they are often incomplete, poorly located, not connected to usable systems, or not aligned with meaningful performance indicators. Even when data exists, it is often not structured in a way that can support decision-making, reporting or compliance.

Those gaps prevent the site from establishing accurate baselines, verifying savings, implementing projects or managing energy performance effectively, and in many cases the existing infrastructure simply is not sufficient to support Energy Performance Indicators or ISO 50001. There is also a lack of clarity about what should actually be installed: which meters are critical, where they should be placed, what instrumentation is required, and how different systems should connect. The result is that energy management cannot progress beyond high-level analysis, because the underlying measurement infrastructure is not in place.

  • Meters that are incomplete, poorly located or disconnected
  • Data that exists but is not structured for decisions or compliance
  • No clarity on which meters are critical, or where they go
  • Energy management stuck at high-level analysis for lack of infrastructure
Technician with a tablet investigating a complex open switchgear cabinet packed with dense wiring
Our method

How EM3 Delivers It

  1. Start from the EnPI gap analysis

    We begin from the outputs of the EnPI Mapping and Meter Gap Analysis, where the required metrics and the missing data points have already been identified, so the metering design is driven by real measurement needs.

  2. Define the metering requirements

    We determine what types of meters or sensors are needed, where they should be installed, and how they should connect to the data-collection systems.

  3. Engineering review of site constraints

    We carry out a detailed engineering review of the physical and operational constraints: reviewing existing infrastructure, identifying suitable installation locations, and understanding how the new meters will integrate with current systems such as SCADA, BMS or other data-collection platforms.

  4. Define the structured solution

    We define the structured metering solution, identifying all the required meters, specifying their function, and mapping how they will generate the data needed for KPI tracking and performance monitoring, phased so the critical meters come first.

  5. Cost it and set the basis of design

    We develop a high-level capital cost estimate with allowances for different options, and where appropriate a Basis of Design for the metering systems, outlining the technical approach, system architecture and implementation considerations.

  6. Deliver a phased plan

    You move from an undefined or incomplete setup to a clearly engineered solution ready for implementation, with the critical installations prioritised and the system designed to expand over time.

What you receive

What You Receive

  • A defined metering solution

    A fully defined metering solution tailored to your site, ready to move into implementation.

  • A complete meter and instrumentation list

    Exactly what needs to be installed to enable effective energy monitoring and KPI tracking.

  • Locations and integration requirements

    Defined meter locations and the system-integration requirements, with clarity on how the metering fits your physical and operational environment, including SCADA and BMS.

  • A phased implementation plan

    A plan that lets you prioritise the critical installations first and expand the system over time in a structured way.

  • A high-level capital cost estimate

    Visibility on the investment required, so you can plan for funding or capital approval.

  • A metering Basis of Design

    Where delivered as part of a broader design process, a Basis of Design defining the engineering approach, scope and system requirements for implementation.

Proven outcome

Proven Outcome

Every meter countsEach one tied to a KPI and a decision
Design, not guessworkWhat to install, where, and how
Implementation-readyA phased plan with costed infrastructure

Metering Solutions is the step that turns the EnPI map into buildable infrastructure. In our work it is the next stage after mapping, defining the metering needed to support KPI tracking, accurate baselines and the future projects, including efficiency and decarbonisation initiatives, that all depend on good data.

The outcome is that a site moves from an undefined or incomplete metering setup to a clearly engineered solution ready for implementation, with the ability to measure energy use at system level, track performance over time and support the verification of savings and compliance. Every meter in the design has a job: a KPI to feed and a decision to inform.

Cleanly installed metering hardware with digital meter displays, drives and neatly terminated wiring in an electrical cabinet
Engineer in hard hat reading electrical meters and recording readings on a clipboard
Why EM3

Why EM3

  • Metering linked to decisions

    We do not design metering in isolation. The whole solution is based on the KPIs defined through EnPI Mapping, so every meter serves a specific purpose in measuring performance and enabling action, which avoids the common trap of installing meters that generate data but do not support analysis or improvement.

  • Grounded in how the site runs

    The design is based on a system-level understanding of how your utilities are generated, distributed and used, rather than relying on standard templates.

  • Integrated with energy management

    The metering is designed to support ongoing reporting, monitoring and compliance frameworks such as ISO 50001, not to act as a standalone technical upgrade.

  • A controlled path to implementation

    The service includes a structured roadmap and cost guidance, so you can move from concept to implementation in a controlled and prioritised manner.

How we engage

How We Engage

Typical durationA defined engineering study
Engagement model

Metering Solutions is delivered as a defined engineering and design scope, often packaged with EnPI Mapping or a Basis of Design study, and priced on the scope and site complexity. The fee covers the analysis, design and specification work that defines the metering solution. The implementation, installation and commissioning of the meters are delivered as separate projects once the design is set. The exact scope is confirmed in a proposal.

FAQ

Frequently Asked Questions

Is this the same as installing meters?

No. This is the engineering definition of what needs to be installed, where, and how. The installation, commissioning and integration are delivered as separate projects once the design is set.

How does it relate to EnPI mapping?

EnPI mapping defines what should be measured and why. Metering Solutions defines how it is physically implemented. We design the metering directly from the KPIs the mapping identified, so every meter has a purpose.

Will the meters work with our SCADA or BMS?

Yes. Part of the engineering review is understanding how the new meters integrate with your existing systems, such as SCADA, BMS or other data-collection platforms, so the data actually flows into your energy management.

What do we get at the end?

A complete list of required meters and instrumentation, defined locations and integration requirements, a phased implementation plan, a high-level capital cost estimate and, where relevant, a metering Basis of Design.

Can we phase the investment?

Yes. Where appropriate we structure the solution into phases, with the critical meters that give immediate visibility first and more detailed or system-specific monitoring later, with cost guidance for each.

Why not just buy meters off the shelf?

Because meters installed in isolation generate data that often does not support meaningful analysis. We design the metering around your KPIs and how your site actually operates, so it supports decisions, reporting and ISO 50001, not just numbers.